Master Plan
Development and Conservation (Master) Plan drawing
This drawing comes from the original 07 August 1997 concept or schematic design for the archaeological park. The plan includes these five major components I.) Control Drainage, Manage – Erosion and Alluvium II.) Control Wind, Manage – Aeolian Sand Deposition III.) Stabilize and Reinforce – Excavation Trench and Ancient Masonry walls IV.) Provide and Manage Access and Visitation Infrastructure V.) Provide for Future Excavation & Continued Scholarship This schematic plan will be expanded and revised to the level of biddable construction documentation in accordance with the Ministry of Culture requirements and oversight .